|
Type: Article
Argente, E. and Giret, A. and Valero, S. and Gómez, P. and Julian, V.
(2005)
Solving Ceramic Tile Factory Production Programming by MAS.
Artificial Intellegence Research and Development. Frontiers in Artificial Intelligence and Applications, 1.
.
ISSN 0922-6389
Full text not available from this archive. AbstractThis paper presents a system architecture to manage the production programming in a Ceramic Tile factory. The proposed architecture is based on the multi-agent system paradigm since it provides a natural way to solve problems in manufacturing industry domains. The production programming problem is considered as one of the main critical issues in a Ceramic Tile Company because obtaining an agile and reactive production planning and scheduling system is essential in manufacturing. The paper describes the proposed agent organization and the different needed scenarios and interactions in detail. Archive Staff Only: edit this record
|